Больше информации по резюме будет доступно после регистрации

Зарегистрироваться

Candidate

Male, 43 years, born on 1 October 1981

Aksay (Kazakhstan), willing to relocate (Aktobe, Astana, Atyrau, Germany, Italy, China, Krasnodar Krai, Moscow, Moscow Oblast, Nenets AO, UAE, Orenburg Oblast, Republic of Crimea, Samara Oblast, Saint Petersburg, Saratov Oblast, Sakhalin Oblast, Tyumen Oblast, Uzbekistan, Uralsk, Philippines, Finland, France, Khabarovsk Krai, Croatia, Czech Republic, Switzerland, Scotland, Japan), not prepared for business trips

Auditor,QA/QC Engineer,Construction Coordinator

Specializations:
  • Other

Employment: full time

Work schedule: full day

Work experience 20 years 10 months

April 2009currently
16 years 2 months
KPO b,v
QA/QC Engineer, General Projects Department.
- Implementation and development of QA system of General Projects Department as per ISO 9000 series standard. - Implementation and updating the database for QA documentation of General Projects Department and its Contractors and Suppliers. - Technical support of the General Projects Department audit team during the audit of the Contractor companies - Surveilance QC inspections of Contractor and Supplier companies aimed at the revealing the system non-conformances during the works performed as per the Contracts with KPO b.v. - Analysis of QA systems of the of Contractor and Supplier companies.
April 2005March 2009
4 years
“PHLAGMAN ”LLC
QA/QC Manager
- Management of QA/QC department - Implementation and supervision of the work of the company in accordance with ISO 9001-2000 requirements, document control, job description issuing, issuing and revising of Quality Management System procedures, internal audits Coordinator of EPC contract (Engineering, Project, Construction) Project “TCC Plant” - Coordination of the following works: earthing and concrete works, installation of steel structures, installation of exhaust and supply ventilation, installation of process and fire water pipeline, electrical and instruments installation, putting facility into operation - Control for construction of LLC “Phlagman” and contractor in accordance with KPO procedures and specifications, ASME, API standard and National RoK standards on: earth works , civil works, concrete works, welding activities and coating works during construction steel structures and pipeline, piping works - Monitoring of KPO specifications, ASME and API standards and N RoK standards maintaining - Carrying out of internal audit. - Define company’s targets in Quality Control - Take part in Quality Control Company Policy - Carrying out of Quality Policy requirements - Issue of developed procedures for quality control, coordination of developed issues, activities coordination; June 01, 2005 till December 14, 2006 “PHLAGMAN ”LLC Position : Certification engineer - Construction activities at Karachaganak Field, Contract AP/Y/1966: production and re-injection wells hook-up, flow lines construction, installation of process pipelines at Unit -3, Unit -3 and KPC during Total Shutdown period, construction of metal structure building at Waste Management Complex; - Preparation and handing over of as-built documents (ICS, Test Packs, MCP,); - Preparation of applications for material; preparation of hidden works acts, accepting acts for every construction done, updating of civil, welding, PWHT log-books. Performance of Welding Inspector’s duties - Supervision of welding activities in accordance with standards requirements (ASME B31.3, B31.8, API 1104, SNIP RK 3.05.09-2002, VSN 06-009), welding consumables control, ASME reporting documentation. - Collection and processing of information on welding, PWHT, NDE. Performance of Material Coordinator’s duties - Receiving, coordination and issuing materials as per projects, updating of warehouse material database. - Work with MS Excel database April 27, 2005 till May 31, 2005 “PHLAGMAN ”LLC Position: Safety Engineer - Preparing of Permits-to-Work, Safety Shutdown plans, Method Statements, control equipment and employees for correspondence with Company’s requirements in the sphere of labor protection, developing and issue of revisions for HSE procedure and labor instruction.
August 2004April 2005
9 months
“BGS-ATYRAU” LLP
QA/QC Engineer
- Construction of roads and underground utilities in accordance with the contract No 2002-0862 “Early works on facilities construction at the Camp Area” and № 2002-0962 “Construction of sweet gas and crude water pipeline” - Settling documents: Hidden work acts, RFI. - Supervision of QC procedure adherence in road and underground facilities construction, blinding concrete, concreting of foundations, trench excavation, earthworks - Sample taking for tests(concrete, asphalt)

About me

- MS Word, MS Excel, Acrobat Reader, MS Outlook, Windows NT, Power Docs, MS Visio, Paint, Internet Explorer

Higher education

2003
Uralsk West Kazakhstan Technical-Agricultural University
Polytechnic , Diploma

Languages

RussianNative


EnglishC2 — Proficiency


Professional development, courses

2010
West-Kazakhstan Engineering-Technological University
Oil & Gas Business , 1 course of part-time study

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter